PPAP Full Form: Production Part Approval Process

Definition

PPAP stands for Production Part Approval Process — the set of documents and samples a supplier submits to an automotive customer to prove that its production process can consistently make parts that meet every requirement, at the quoted rate.

Key facts
TermPPAP (Production Part Approval Process)
In Hindiउत्पादन पुर्ज़ा अनुमोदन प्रक्रिया (PPAP)
AreaProduction & quality
Search phrasePPAP full form
Try itCAPA full form

उत्पादन पुर्ज़ा अनुमोदन प्रक्रिया (PPAP) — हिंदी में अर्थ

PPAP का पूरा नाम Production Part Approval Process है — वह दस्तावेज़ और नमूनों का सेट जो सप्लायर ऑटोमोबाइल ग्राहक को देता है, यह साबित करने के लिए कि उसकी उत्पादन प्रक्रिया तय दर पर लगातार हर आवश्यकता पूरी करने वाले पुर्ज़े बना सकती है।

The 18 PPAP elements

1. Design records; 2. Engineering change documents; 3. Customer engineering approval; 4. Design FMEA; 5. Process flow diagram; 6. Process FMEA; 7. Control plan; 8. Measurement system analysis (MSA); 9. Dimensional results; 10. Material and performance test results; 11. Initial process studies (Cpk); 12. Qualified laboratory documentation; 13. Appearance approval report; 14. Sample production parts; 15. Master sample; 16. Checking aids; 17. Customer-specific requirements; 18. Part Submission Warrant (PSW).

Submission levels and triggers

Level 1: PSW only. Level 2: PSW with samples and limited data. Level 3: PSW with samples and complete data — the default unless the customer says otherwise. Level 4: PSW and other requirements set by the customer. Level 5: PSW with samples and complete data reviewed at the supplier's site.

PPAP is needed for a new part, and again after a change in design, material, sub-supplier, tooling, location or process. It is part of the IATF 16949 framework that Indian auto-component makers supplying vehicle OEMs work under.

Example

A Pune press shop wins a new bracket for a two-wheeler OEM. Before mass supply it runs a significant production run, measures parts for the dimensional report, shows Cpk ≥ 1.67 on critical dimensions, and submits a Level 3 PPAP with the signed PSW.

Related tools and guides

Frequently asked questions

What is the full form of PPAP?

Production Part Approval Process.

How many elements are in PPAP?

Eighteen, ending with the Part Submission Warrant (PSW).

What is the default PPAP level?

Level 3 — PSW with product samples and complete supporting data.

What is the difference between PPAP and APQP?

APQP is the planning process for a new product; PPAP is the approval at the end of it proving the process is ready.